Clarify requirements
Confirm application, loads, location and schedule; record procurement or rental preference.
SolutionsConnect generation, distribution, load testing and storage for maintenance, shipyards, mines and events. Define the operating conditions, clarify supplier responsibilities and plan delivery.
Confirm application, loads, location and schedule; record procurement or rental preference.
SolutionsAgree configuration, supplier, cost boundaries, delivery conditions and acceptance criteria.
EquipmentInstall, commission and load-test against the confirmed plan; retain handover records.
ServicesFrom maintenance transfers to remote mines, marine trials and critical event loads: configure equipment and services around the site.
Before maintenance, define critical loads, the existing single-line diagram, transfer windows and permissible interruption. Assess interfaces between temporary generation, UPS and the grid.
Map broadcast, timing, lighting, audio, security and medical loads. Separate critical circuits from general supply.
For yard commissioning, harbour tests and sea trials, confirm AC or DC loads, duration, power factor and recording requirements.
For mine development, expansion and standby power, map loads and operating priorities for ventilation, drainage, hoisting and processing.
Analyse load profiles and operating strategy for peak shaving, solar self-consumption, backup loads and off-grid or weak-grid sites.
Explore equipment capacities, models and applications. Confirm configuration, availability and pricing for your project.
Cables, AC distribution, DC cabinets, ATS, batteries and tanks complete the connection between supply and site loads.
Medium- and low-voltage generators and power trucks for temporary supply, standby power and maintenance configurations.
Verify generation and distribution performance with load testing. Match test capacity, power factor and test methods to your project.
From 5.12 kWh residential batteries to 5.016 MWh container systems. Show power and stored energy separately and match the operating strategy.
Ring main units, compensation, TCS and grounding-resistor equipment configured for voltage class, wiring plan and protection boundaries.
Ratings from 630 to 10000 kVA. Match voltage conversion to project voltage, load and protection coordination.
Indoor UPS ratings of 100–800 kVA and outdoor rating of 400 kVA. Confirm autonomy, topology and transfer needs for critical loads.
Practical explanations for procurement, rental and engineering conversations. Help your team prepare an actionable project brief.
Verify generation and distribution performance with load testing. Match test capacity, power factor and test methods to your project.
Confirm application, loads, location and schedule; record procurement or rental preference.
Energy capacity and kVA describe different quantities. Confirm active generator and load-bank power from nameplate data and power factor. Storage kW is power; kWh is energy, and they are not interchangeable.
Tell us the application, location, equipment or capacity, schedule and preferred cooperation model. The team will review your enquiry; submitting this form does not create an order or payment obligation.