Project considerations
For yard commissioning, harbour tests and sea trials, confirm AC or DC loads, duration, power factor and recording requirements.
Configure generators, load banks, transformers and distribution protection. Plan around deck space, lifting access and cable routes.
The parties confirm test procedures, acceptance criteria and any classification-society witnessing. Supplier certificates and project references are verified against the actual provider.