Load testing: from capacity to test plan

Verify generation and distribution performance with load testing. Match test capacity, power factor and test methods to your project.

For yard commissioning, harbour tests and sea trials, confirm AC or DC loads, duration, power factor and recording requirements.

Configure generators, load banks, transformers and distribution protection. Plan around deck space, lifting access and cable routes.

The parties confirm test procedures, acceptance criteria and any classification-society witnessing. Supplier certificates and project references are verified against the actual provider.

Energy capacity and kVA describe different quantities. Confirm active generator and load-bank power from nameplate data and power factor. Storage kW is power; kWh is energy, and they are not interchangeable.